Bored pier inspection, Wollert

A bored pier inspection looks at the drilled footing holes before concrete is placed. We check depth, diameter, founding material, hole cleanliness and the steel cages against the engineer's design.

  • Once the holes are bored and the cages are in, before any concrete goes near them
  • About 1 hour on site
  • Report within 24 hours
Get your Wollert inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage1 of 7
When to bookOnce the holes are bored and the cages are in, before any concrete goes near them
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Wollert bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Wollert builds

Wollert sits on the Newer Volcanics basalt plains, so the profile is usually heavy reactive clay sitting over basalt, with rock floaters through it. A rig can stop on a floater and call it rock. Piers on this ground have to reach the founding material the engineer nominated, and the lot's own soil report governs that depth.

What we find at this stage in Wollert

  • Piers drilled shallower than the depth the engineer's footing plan calls up
  • Holes stopped on a rock floater rather than the nominated founding material
  • Loose spoil, mud or slurry left in the base of the hole before pouring
  • Pier diameter under size, or the hole belled out and off the set-out point
  • Steel cages short, out of centre, or sitting on the ground with no spacers
  • Water standing in the hole with no plan to remove it before concrete goes in
Meter box and conduit installed and looking sound, Wollert
Meter box and conduit installed and looking sound
Not enough concrete cover over the steel, which lets the reinforcement corrode, Wollert
Not enough concrete cover over the steel, which lets the reinforcement corrode
Some bars shown on the engineering plans have not been installed, Wollert
Some bars shown on the engineering plans have not been installed
Sample findings

Sample defects found during our bored piers inspections in Wollert

Annotated findings from Bored piers inspections on Wollert builds. Client addresses withheld.

Extra bar chairs needed to hold the steel at the right concrete cover, found during a bored pier inspection in Wollert
Extra bar chairs needed to hold the steel at the right concrete cover
Hot water service mesh not yet in place under the slab area, found during a bored pier inspection in Wollert
Hot water service mesh not yet in place under the slab area
Slab formwork needs more bracing so it holds its shape during the pour, found during a bored pier inspection in Wollert
Slab formwork needs more bracing so it holds its shape during the pour
Reinforcement not sitting on bar chairs, so it is not held clear of the ground, found during a bored pier inspection in Wollert
Reinforcement not sitting on bar chairs, so it is not held clear of the ground
Wide external beam missing the extra bottom bar its width calls for, found during a bored pier inspection in Wollert
Wide external beam missing the extra bottom bar its width calls for

The other stages of a Wollert build

  1. Slab pre-pour inspection in Wollert2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
  2. Frame inspection in Wollert3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
  3. Lock-up (pre-plaster) inspection in Wollert4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
  4. Fixing inspection in Wollert5FixingAfter plaster, doors and cabinetry, before the painter starts
  5. Waterproofing inspection in Wollert6WaterproofingAfter the waterproofer finishes and before a single tile is laid
  6. Pre-handover (PCI) inspection in Wollert7Pre-handover (PCI)At practical completion, before you sign anything or hand over the final payment

All construction stage inspections in Wollert →

Guides

Construction stage guides for Wollert

All guides →

Book a bored piers inspection in Wollert

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Wollert: common questions

Can you check pier depth after the concrete is poured?

No. Once concrete is in the hole the depth, the base and the cage are all hidden. A pier inspection only works before the pour, which is why it has to be booked around the drilling day.

Who decides how deep my piers have to be?

The engineer does, working from the soil report for your lot and AS 2870. We measure what was drilled against that design rather than against a rule of thumb, because depths change from lot to lot.

Does every home in the corridor need bored piers?

No. Some lots are built on a stiffened raft slab with no piers at all. Piers appear where the soil report and the footing design call for them, commonly on reactive or filled ground.

What if the rig hits rock early?

That is a question for the engineer, not the builder alone. Rock floaters near the surface are common on basalt country, and founding on one is not the same as founding on the rock the design assumed.

How long are you on site for a Wollert inspection?

Usually one to two hours, depending on how many piers are open and whether the drilling is still running. We report the same day or the next business day with photos of each hole we could see.

Do you go into the holes?

No. All of our work is visual and from the surface, using a measuring tape and a light. We do not enter excavations and we do not carry out any testing of soil or concrete.