Frame inspection in Wollert

A frame inspection is done once the wall frames are standing and the roof trusses are fixed in place, but before wrap, insulation and cladding hide everything from view.

  • Once the trusses are up, before wrap, sarking or cladding hides anything
  • 1 to 2 hours on site
  • Report within 24 hours
Get your Wollert inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage3 of 7
When to bookOnce the trusses are up, before wrap, sarking or cladding hides anything
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Wollert frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Wollert builds

Homes on the northern plains sit on open, exposed lots with little shelter, so bracing and tie-down have to match the wind classification set for the site under AS 4055. The frame also has to stay square while the reactive clay below it moves seasonally. Straight walls now save cracked cornices later.

What we find at this stage in Wollert

  • Bracing units short of the design, or braces nailed off with too few fixings
  • Tie-down rods and straps missing at braced walls and at truss connections
  • Lintels undersized or unsupported over wide window and garage openings
  • Studs out of plumb, walls bowed, or top plates not straight along a run
  • Bottom plates loose on the slab, or anchors set too close to the slab edge
  • Notched or drilled studs and plates cut past what AS 1684 allows
Bottom plates needing masonry nails at 600mm or bolts at 1200mm centres, Wollert
Bottom plates needing masonry nails at 600mm or bolts at 1200mm centres
Temporary downpipes not discharging to stormwater, so water ponds around the slab, Wollert
Temporary downpipes not discharging to stormwater, so water ponds around the slab
Heavy use of plastic packers to level the upper floor framing, needing engineer confirmation, Wollert
Heavy use of plastic packers to level the upper floor framing, needing engineer confirmation
Sample findings

Sample defects found during our frame inspections in Wollert

Annotated findings from Frame inspections on Wollert builds. Client addresses withheld.

Concrete recess runs under the wall frame, leaving the plaster without proper support, found during a frame inspection in Wollert
Concrete recess runs under the wall frame, leaving the plaster without proper support
Slab out of level by more than the allowed tolerance, so it needs fixing before framing is signed off, found during a frame inspection in Wollert
Slab out of level by more than the allowed tolerance, so it needs fixing before framing is signed off
Honeycombing along the slab edge, which weakens the concrete and exposes the steel, found during a frame inspection in Wollert
Honeycombing along the slab edge, which weakens the concrete and exposes the steel
Slab sticking out past the timber frame by over 20mm, squeezing the brick cavity, found during a frame inspection in Wollert
Slab sticking out past the timber frame by over 20mm, squeezing the brick cavity
Beam connection not built the way the engineering drawings specify, found during a frame inspection in Wollert
Beam connection not built the way the engineering drawings specify

The other stages of a Wollert build

  1. Bored piers inspection in Wollert1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
  2. Slab pre-pour inspection in Wollert2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
  3. Lock-up (pre-plaster) inspection in Wollert4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
  4. Fixing inspection in Wollert5FixingAfter plaster, doors and cabinetry, before the painter starts
  5. Waterproofing inspection in Wollert6WaterproofingAfter the waterproofer finishes and before a single tile is laid
  6. Pre-handover (PCI) inspection in Wollert7Pre-handover (PCI)At practical completion, before you sign anything or hand over the final payment

All construction stage inspections in Wollert →

Guides

Construction stage guides for Wollert

All guides →

Book a frame inspection in Wollert

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Wollert: common questions

When is the frame stage finished?

The frame is ready to inspect once walls, roof trusses and any structural steel are fixed in place and the tie-downs are installed. It is no longer inspectable once wrap and cladding cover the timber.

Which standard governs timber framing?

AS 1684 covers residential timber framed construction, together with the truss manufacturer's layout and the wind classification determined under AS 4055. Steel framed homes follow their own manufacturer's design instead.

Should I inspect before or after the plumber and electrician?

After the rough in wherever possible. That way we can see whether pipes and cables have been run through notched or drilled members in ways the framing standard does not permit.

Are small bows in a wall a defect?

It depends on how much. The Guide to Standards and Tolerances 2015 sets the limits for straightness and plumb in Victoria, and we measure against those rather than calling every ripple a defect.

Can the builder keep working while you inspect?

Yes, and most do. We work around the trades on site. What we ask is that nothing is wrapped or lined until the report has been read and any agreed items have been attended to.

Do you check the electrical rough in?

No. We do not inspect, test or energise electrical work at any stage. A licensed electrician handles that. We do report where a cable run has damaged a structural member.