When to book each stage inspection on a Wollert build
How to time the pre-slab, frame, lock-up, waterproofing and fixing inspections on a new Wollert home so faults are found while work is open.
The practical completion inspection is your last look before you pay the final claim and take the keys. Everything is checked against the contract, the NCC and the Victorian tolerances.
A new Wollert home is handed over onto ground that will move through its first seasons, so the handover list matters for what it records as much as what it fixes. Establishing the condition of the slab, the brickwork and the internal finishes at handover gives you a clear baseline if cracking appears in year one.



Annotated findings from Pre-handover (PCI) inspections on Wollert builds. Client addresses withheld.





1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
5FixingAfter plaster, doors and cabinetry, before the painter starts
6WaterproofingAfter the waterproofer finishes and before a single tile is laid
How to time the pre-slab, frame, lock-up, waterproofing and fixing inspections on a new Wollert home so faults are found while work is open.

Wollert sits on Newer Volcanics basalt with heavy reactive clay above it. What that means for slab design and your pre-slab check.

What to do in Victoria when a builder blocks your private stage inspector, including contract access, written notice and the BPC dispute pathway.
Instant online pricing, or talk to the booking team on 1300 471 805.
Your contract and selections first, then the NCC and the ABCB Housing Provisions, then the Guide to Standards and Tolerances 2015. That guide is the Victorian benchmark for finish, level, plumb and straightness.
Take advice on your own contract before paying. Most domestic building contracts allow the final claim at practical completion, with defects attended to in the rectification period, so raise items in writing early.
That comes from your contract, which normally sets a defects liability or rectification period after handover. Report items in writing within that period and keep the correspondence, because dates matter later.
No. A handover report is written for you and your builder. VCAT needs an expert witness report prepared for that purpose, and we can prepare one separately if a matter goes that far.
Raise it with the builder in writing first. If it stays unresolved, the Building and Plumbing Commission runs a dispute resolution service, formerly DBDRV, and VCAT's Building and Property List comes after that.
No. We do not test, operate or energise electrical work, gas appliances or cooktops. Those are for a licensed electrician or gasfitter. We do report visible damage and obvious incomplete work.